Stockley Park - Phase 2

Posted on 2nd August, 2013

 

The second phase of the Stockley Park project was an 18t winter garden floor, erected inside the existing building using a spider crane for lifting the beams into place.

 

We have our own CPCS trained operators for the spider cranes, leaving only Cobra Steel operatives inside the work area.