Cobra Steel are currently working on a retention tower.
The tower is being built up through the existing floors from the basement up to the fourth floor.
This then has support arms from the tower across to walers fixed to the wall to be retained, allowing the existing building to be demolished.
Make A Comment
Comments (0)